Emergency Contact

To contact us in the event of an emergency, please call
1-866-544-9875.

This number is for emergency use only. For other purposes, please contact our office at (587) 475-0210 or visit our contact page.

 
TMX   TWM 1.01

Tidewater Midstream and Infrastructure Ltd.

STRATEGICALLY POSITIONED ASSETS FOR ENHANCED CUSTOMER NETBACKS

Our Core Facilities


Our Prince George Refinery (known as "PGR") is located in Prince George, British Columbia

  • 12.0 Mbbl/d light oil refinery that predominantly produces low sulfur diesel and gasoline, in addition to other products, to supply the greater Prince George region.
  • PGR has significant onsite storage capacity of greater than 1.0 MMbbl and flexible logistics, with pipeline, rail and truck connectivity in place.
  • The Prince George region is generally in short supply of refined products. The PGR's location within the Prince George region makes it a critical piece of infrastructure with a significant logistical advantage to address the demand for these products.

PGR.png


Our Brazeau River Complex (known as the "BRC") is West of Drayton Valley, Alberta.

The BRC will be the primary gas supply source for Tidewater's Pioneer Pipeline.

  • 10,000 barrel per day Fractionation Facility
  • Blending Facility
  • Liquids Truck-In/Truck-Out Capability

Photo Mar 06, 12 23 52 PM.jpg


The Pioneer Pipeline is connected to Tidewater's Brazeau River Complex

Tidewater is pleased to announce that the Tidewater operated Pioneer Pipeline, connecting Tidewater’s Brazeau River Complex (“BRC”) gas plant to TransAlta’s generating units at Keephills and Sundance, transported first gas in late May 2019, approximately four months ahead of schedule.

  • Sales Gas Pipeline connected into TransAlta's Keephills and Sundance Power Generation Facilities.
  • Currently flowing approximately 50 MMcf/day of natural gas during this start-up phase where initial flows may fluctuate depending on market conditions.
  • Throughput of approximately 130 MMcf/day of natural gas will commence flowing through the Pioneer Pipeline November 1, 2019.
  • Tidewater and TransAlta each own a 50% interest in the Pioneer Pipeline which is backstopped by a 15-year take-or-pay agreement from TransAlta at market rate tolls.

Pioneer Map and pics.png


Our Ram River facility is West of Rocky Mountain House, Alberta.

  • Sour Gas Processing Plant
  • Sulphur Forming and Remelting Facility
  • Unit Train Rail Spur

Ram River


Our Valhalla Central Battery is North of Grande Prairie, Alberta.

  • Blending facility
  • Liquids truck-in
  • 20,000 barrels of Liquids Storage

Valhalla


Our Acheson Terminal is West of Edmonton.

  • 120 Car NGL & Crude Oil Rail Facility
  • Blending Site
  • Liquids Storage

DJI_0315.JPG